Lankelma has developed rigs specifically to work with the restrictions of the rail environment: the Rail Truck (above) overcomes the obstacle of short weekday possessions; the 360 Road Rail plant performs site investigations in the hardest-to-access areas, whilst the mobile rams can test tunnel walls at any angle.
Click here to download the rail SI capability statement 4.49MB
Rail instrumentation We use our hydraulic rigs to install a wide range of geotechnical instrumentation. This push-in method causes minimal disturbance to the ground and can provide technically superior installations. High productivity is also achieved, with in excess of 150m per day achievable.